How Much Concrete for a 30×50 Pool deck?
The answer
20.37 cubic yard
For a 30×50 ft pool deck at 4" depth, with 10% overage included. Estimated cost: $3,361 at US national average pricing.
Calculate Concrete
Common projects
You need
—
cubic yard
- Area
- —
- Volume
- —
- With 10% overage
- —
- Or in 60 lb bag
- —
- Estimated cost (US avg)
- —
How we calculated this
- 1. Area: 30 × 50 = 1500 sq ft
- 2. Volume: 1500 × (4/12) = 500 cubic feet
- 3. Convert + overage: Add 10% for waste → 20.37 cubic yard
- 4. Cost: 20.37 × $165.00 ≈ $3,361
Similar projects
Concrete for a 4×4 pool deck Concrete for a 4×6 pool deck Concrete for a 4×8 pool deck Concrete for a 5×5 pool deck Concrete for a 5×7 pool deck Concrete for a 5×10 pool deck Concrete for a 6×6 pool deck Concrete for a 6×8 pool deck Concrete for a 6×10 pool deck Concrete for a 6×12 pool deck Concrete for a 8×8 pool deck Concrete for a 8×10 pool deck