How Much Concrete for a 24×30 Driveway?
The answer
14.67 cubic yard
For a 24×30 ft driveway at 6" depth, with 10% overage included. Estimated cost: $2,420 at US national average pricing.
Calculate Concrete
Common projects
You need
—
cubic yard
- Area
- —
- Volume
- —
- With 10% overage
- —
- Or in 60 lb bag
- —
- Estimated cost (US avg)
- —
How we calculated this
- 1. Area: 24 × 30 = 720 sq ft
- 2. Volume: 720 × (6/12) = 360 cubic feet
- 3. Convert + overage: Add 10% for waste → 14.67 cubic yard
- 4. Cost: 14.67 × $165.00 ≈ $2,420
Similar projects
Concrete for a 4×4 driveway Concrete for a 4×6 driveway Concrete for a 4×8 driveway Concrete for a 5×5 driveway Concrete for a 5×7 driveway Concrete for a 5×10 driveway Concrete for a 6×6 driveway Concrete for a 6×8 driveway Concrete for a 6×10 driveway Concrete for a 6×12 driveway Concrete for a 8×8 driveway Concrete for a 8×10 driveway