DIYCrunch

How Much Concrete for a 15×20 Driveway?

The answer

6.11 cubic yard

For a 15×20 ft driveway at 6" depth, with 10% overage included. Estimated cost: $1,008 at US national average pricing.

Calculate Concrete

Common projects

You need

cubic yard

Area
Volume
With 10% overage
Or in 60 lb bag
Estimated cost (US avg)

How we calculated this

  1. 1. Area: 15 × 20 = 300 sq ft
  2. 2. Volume: 300 × (6/12) = 150 cubic feet
  3. 3. Convert + overage: Add 10% for waste → 6.11 cubic yard
  4. 4. Cost: 6.11 × $165.00 ≈ $1,008

Similar projects