DIYCrunch

How Much Concrete for a 10×12 Shed pad?

The answer

1.63 cubic yard

For a 10×12 ft shed pad at 4" depth, with 10% overage included. Estimated cost: $269 at US national average pricing.

Calculate Concrete

Common projects

You need

cubic yard

Area
Volume
With 10% overage
Or in 60 lb bag
Estimated cost (US avg)

How we calculated this

  1. 1. Area: 10 × 12 = 120 sq ft
  2. 2. Volume: 120 × (4/12) = 40 cubic feet
  3. 3. Convert + overage: Add 10% for waste → 1.63 cubic yard
  4. 4. Cost: 1.63 × $165.00 ≈ $269